Financial Number: 439993-1-52-01
Project Length: 0.276 miles
Project Limits: SW 148 AVE FROM SW 52ND DR TO SW 48TH CT/BASS CREEK RD. TRAFFIC CIRCLE AT SW 148TH AVE AND SW 48TH CT/BASS CREEK ROAD; MULTI-USE PATH FROM CORAL COVE ELEMENTARY SCHOOL ENTRANCE TO SW 48TH CT./BASS CREEK RD.
County: Broward
Start Date: Summer 2022
Completion Date: Fall 2023
Contractor: TBD
Estimated Construction Cost: $886,000
Scope of Work:
Construct a traffic circle (roundabout) at the intersection of SW 148th St and Bass Creek Rd. Construct a multi-use-path on the east side of SW 148th St from Coral Cove Elementary School to Bass Creek Rd.
- Existing closed drainage system to remain. New French Drain for proposed improvements.
- Several palm trees, sod, and shrubs are proposed.
- Lighting roadway surface within the circulatory roadway.
- Two flashing beacons with solar panel for advanced warning.
- Designated bike lane pavement markings.
- The existing typical along SW 148th St is two lane undivided (12’ wide lanes) and the proposed typical section along is two lanes undivided with a merge lane southbound and a multi-use path northbound.