SW 148 Avenue From SW 52nd Dr to SW 48th CT/Bass Creek Rd.

Financial Number: 439993-1-52-01

Project Length: 0.276 miles

Project Limits: SW 148 AVE FROM SW 52ND DR TO SW 48TH CT/BASS CREEK RD. TRAFFIC CIRCLE AT SW 148TH AVE AND SW 48TH CT/BASS CREEK ROAD; MULTI-USE PATH FROM CORAL COVE ELEMENTARY SCHOOL ENTRANCE TO SW 48TH CT./BASS CREEK RD.

Public Information Meeting:

County: Broward

Start Date: Summer 2022

Completion Date: Fall 2023

Contractor: TBD

Estimated Construction Cost: $1.2 M

Scope of Work:

Construct a traffic circle (roundabout) at the intersection of SW 148th St and Bass Creek Rd. Construct a multi-use-path on the east side of SW 148th St from Coral Cove Elementary School to Bass Creek Rd.

  • Existing closed drainage system to remain. New French Drain for proposed improvements.
  • Several palm trees, sod, and shrubs are proposed.
  • Lighting roadway surface within the circulatory roadway.
  • Two flashing beacons with solar panel for advanced warning.
  • Designated bike lane pavement markings.
  • The existing typical along SW 148th St is two lane undivided (12’ wide lanes) and the proposed typical section along is two lanes undivided with a merge lane southbound and a multi-use path northbound.

Contact Information:

 

Project Photos

Click to view enlarged version/details
 
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero