FDOT District Four - Palm Beach Header Image

SR 802/Lake Worth Road Improvements Project

Financial Number: 441632-1-52-01

Project Length: 1.90 miles

Project Limits: Raulerson Drive to Palm Beach State College Entrance/Douglas Drive

Start Date: November 14, 2022

Completion Date: Spring 2025

Contractor: Zahlene Enterprises Inc.

Estimated Construction Cost: $14 million

Scope of Work:
The project improvements consist of constructing a new exclusive right turn lane from eastbound Lake Worth Road into the Mid-County Senior Center, installing new seven-foot bike lanes with upgraded safety features, milling and resurfacing Lake Worth Road in both directions, replacing underground Palm Beach County utilities throughout the project limits, improving sidewalk and driveways on both sides of Lake Worth Road, modifying medians to improve motorist safety, improving signalized intersections and pedestrian crossings, and installing new signage, pavement markings, and lighting.

Point of Contact:

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

Documents:

PDF IconSR 802/Lake Worth Road Improvements Project from Raulerson Drive to Palm Beach State College Entrance

Click here for upcoming lane closures

Virtual Public Meeting:

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details
New aluminum handrail installed near Swap Shop   March 2024 New curb and gutter in the median   March 2024 Irrigation Service Point Being Constructed by Mid County Senior Center   April 2024 New Drainage Inlet Top Being Replaced   April 2024
Light Pole Spread Footing Installed on South Side of Lake Worth Road at Military Trail   May 2024 Installation of 18” Drainage Pipe Crossing La ke Worth Road near Coconut Road   May 2024 Installation of 18” Drainage Pipe Crossing Wisc onsin Street at Lake Worth Road   June 2024 Sidewalk Reconstruction on the South Side of Lake Worth Road West of Military Trail   June 2024
Sidewalk Reconstruction on the South Side of Lake Worth Road East of Military Trail   July 2024Clearing and Grubbing Continuing Along South Side of Lake Worth Road East of Davis Road   July 2024Foundation Construction for the New Mid Block Crossing Traffic Controller Cabinet at Urquhart Street   August 2024Clearing and Grubbing Along North Side of Lake Worth Road West of Kirk Road   August 2024
Preparing for New Sidewalk Along North Side of Lake Worth Road East of Kirk Road   September 2024Two Component Polyurethane Injection Around Drainage Structure on South Side of Lake Worth Road   September 2024Driveway Installed on the south side of Lake Worth Road East of the Swap Shop   October 2024Traffic Signals Installed on the North Side of Lake Worth Road at Fire Station 31   October 2024
 

Please click on a link below to view construction projects
in other areas of Palm Beach County:
  I-95 Palm Beach CountyI-95 Construction Palm Beach County Northern Palm Beach CountyNorthern Palm Beach County
  Southern Palm Beach CountySouthern Palm Beach County Western Palm Beach CountyWestern Palm Beach County
  Central Palm Beach CountyCentral Palm Beach County Bridges Palm Beach CountyBridge Construction Palm Beach County

Florida Department of Transportation
Florida Department of Transportation
FDOT District Four Youtube
Kids Zone
zero