Financial Number: 447658-1-52-01
Project Length: 1.137 miles
Project Limits: SR 5/US 1 Resurfacing, Restoration, and Rehabilitation Project from Bailey Street to south of Eve Street
In-Person Coffee with the Construction Team: Tuesday, December 17, 2024, from 10:30 a.m. to 12:00 p.m. at Gizzi’s Coffee at 2275 South Federal Highway in Delray Beach, FL 33483
Project Information Video:
Start Date: December 2024
Completion Date: Late 2025
Contractor: General Asphalt Co
Construction Cost: $3.5 million
Scope of Work:
Project improvements include milling and repaving the existing roadway to ensure long-term resilience; restriping the roadway to provide 11-foot lanes and 6-foot bike lanes in each direction of SR 5/US 1 within the project limits for motorist and bicyclist safety; restriping the C-15 Canal bridge lanes to provide a 4-foot bike lane in each direction for bicyclist safety; upgrading curb ramps for pedestrian safety; upgrading pedestrian signals at Lindell Boulevard and Tropic Boulevard to new LED countdown signals to enhance pedestrian safety; upgrading the existing streetlights to LED fixtures at the intersections of Lindell Boulevard and Tropic Boulevard for longevity, efficiency, and pedestrian safety; and upgrading signage and pavement markings to enhance motorist safety.
Point of Contact:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
Documents:
SR 5 US 1 Bailey to Eve_Project Flyer.pdf
Click here for upcoming lane closures
|