Financial Number: 447667-1-52-01
Project Length: 0.652 miles
Project Limits: State Road (SR) 804/Boynton Beach Boulevard from N. Congress Avenue to NW 8 Street
Public Meeting:
Construction Start Date: January 2025
Anticipated Completion: September 2025
Construction Cost Estimate: $1.2 million
Scope of Work:
- Repave SR 804/ Boynton Beach Boulevard from SR 7/ US 441 to Lyons Road
- Widen bicycle lanes to 6-foot from 4-foot
- Construct sidewalk on eastbound direction to fill the gap East of SR 7 over the E-1 Canal to enhance pedestrian connectivity
- Widen and repair sidewalk that meanders in front of Bethesda Hospital to 10-foot from 5-foot
- Upgrade curb cut ramps that are not compliant with Americans with Disabilities Act (ADA)
- Upgrade signing and pavement markings
- Upgrade guardrail connections to the existing bridge
Construction Impacts:
- Work will be done in phases to reduce the effects of construction to the community
- Temporary lane closures to build improvements will be completed during non-peak hours
- Repaving and restriping will be performed during nighttime
- Pedestrian traffic will be maintained at all times
- Access to properties adjacent to the corridor will always be maintained during construction
Documents:
State Road (SR) 804/ Boynton Beach Boulevard from N. Congress Avenue to NW 8th Street FPID: 447667-1-52-01
Contact Information:
Project Location Map:
|