SR 7/US 441 and SR 858/Hallandale Beach Boulevard Transit Improvements Project

Financial Number: 429576-2-52-01, 02, 03, 04 /441772-1-52-01

Project Length: 22 miles

Project Limits: SR 7/US 441 from the Broward / Miami-Dade County Line to North of Sample Road and SR 858/Hallandale Beach Boulevard from Edmund Road to SW 58 Avenue

Start Date: April 14, 2022

Completion Date: January 11, 2024

Contractor: Weekly Asphalt Paving, Inc.

Estimated Construction Cost: $4,581,957

Scope of Work:
Project improvements include: upgrading pedestrian signals with countdown timers and converting the existing lighting to LED along SR 7/US 441 at 23 intersections; adding a signalized, pedestrian mid-block crossing at the intersection of SR 7/US 441 and NW 3 Street; installing a 7-foot bicycle lane along westbound SR 858/Hallandale Beach Boulevard; widening the roadway to accommodate bicycle lanes along SR 7/US 441 from Southgate Boulevard to Cypress Creek Greenway/C-14 Canal; upgrading sidewalks and curb ramps at 23 intersections

Documents:

PDF IconProject Flyer SR 7 Hallandale Beach Transit Project

Point of Contact:

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

 

Click here for upcoming lane closures

 

Project Photos

Pre-Construction

 

During Construction

 

 



Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero