SW 10th Street Connector PD&E Study

official project website: www.sw10street.com

Financial Number: 439891-1-22-02

Project Length: 3 miles

Project Limits: Florida’s Turnpike/Sawgrass Expressway to west of I-95

Start Date: Design-Build funding starting in FY 2023

Anticipated Completion Date: 2027/28

Estimated Construction Cost: $325 M with Powerline Road Ramps Alternative; $229 M without Powerline Road Ramps Alternative

Scope of Work:

  • Add four-lane connector road (includes center barrier wall, outside barrier wall, and full width paved shoulders)
  • Add 12-foot wide shared use path on the southside of local SW 10th Street
  • Enhance crosswalks at Powerline Road and Military Trail

Benefits of the Build Alternatives:

  • Reduces Congestion
    • With Powerline Road Ramps: Reduced local traffic peak hour 2040 design year volumes below current traffic level by -73% in the am and -52% in the pm
    • Without Powerline Road Ramps: Reduces local traffic peak hour 2040 design year volumes below current traffic level by -40% in the am and -20% in the pm
  • Promotes Regional Connectivity:
    • Connects limited access facilities: I-95, Sawgrass, and Turnpike via a high-speed corridor
  • Improves Emergency Response Times and Evacuation Operations
  • Improves Pedestrian and Bicycle Connectivity: 12-foot wide shared use path throughout the corridor

Contact Information:

PDF Icon SW 10th Street Connector PD&E Study

 

Project Photos

Click to view enlarged version/details
 
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero