SR 710/SW Warfield Boulevard at SW Tommy Clements Street Intersection Improvement Project

Financial Number: 448397-1-52-01

Project Limits: 0.3825 miles

Project Length: SR 710/SW Warfield Boulevard from approximately 700 feet west of SW Tommy Clements Street to 1,320 feet east of SW Tommy Clements Street

Virtual Public Meeting:

Start Date: January 3, 2024

Completion Date: Early 2025

Contractor: Zahlene Enterprises, Inc.

Estimated Construction Cost: $4.8 million

Scope of Work: Project improvements consist of constructing a left turn lane on SR 710/SW Warfield Boulevard at SW Tommy Clements Street, constructing ten-foot paved shoulders in each direction of SR 710/SW Warfield Boulevard, and constructing a retaining wall, upgrading drainage, signage, and pavement markings.

Point of Contact:

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

Documents:

PDF IconVPM SR 710 at SW Tommy Clements St Intersection Improvement

PDF IconSR 710 at Tommy Clements St Intersection Improvement Project Meeting Invitation Flyer

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details \ \ \
Permanent shoulder construction, Jan. 2024 Silt fence installation in staging area, Jan. 2024 Silt fence installation northbound SR710, Jan. 2024 Southbound shoulder of SR 710 just southeast of SW Tommy Clements Street, Feb. 2024
Guardrail height reset Northbound SR 710, Feb. 2024 Northbound SR 710 Warfield Blvd. shoulder paving, Mar. 2024 Northbound SR 710 Warfield Blvd. installation of drop off material after shoulder paving, Mar. 2024 Sheet piler Equipment delivered, Apr. 2024
Sheet pile installation, Apr. 2024 View of installed sheet pile going from the northwest to the southeast, Apr. 2024 Sheet Piler Equipment delivered to the site to begin phase 1 sheet pile installations, Apr. 2024 FPL contractor trimming back palm trees and vegetation encroaching on the utility relocation areas for the overhead powerlines to be relocated, May 2024
Sheet pile reinstallations south of overhead power relocation area, May 2024 Sheet Pile Installation along SR 710, June 2024 FPL Installation of new pole and cables, June 2024 Preparing Formwork for Sheet Pile, July 2024
Concrete crew finishing slipform class II conctrete pour for barrier wall coping junction slab located on SR 710 Warfield Blvd at SW Tommy Clements Street, August. 2024Rebar tied in place for slipform concrete barrier wall and junction coping slab.  Located at left roadway on NB & WB SR 710 Warfield Blvd at SW Tommy Clements Street, August. 2024Concrete slipform operation for class II conctrete pour on concrete barrier wall coping junction slab located on SR 710  Warfield Blvd at SW Tommy Clements Street, August. 2024Steel tied for concrete barrier wall, September. 2024
New guardrail installation at SW Tommy Clements Street, September. 2024 View of installed guardrail end treatment at the south end of the project, Oct. 2024 Left roadway widening area subgrade, Oct. 2024 Gaurdrail installation, Nov. 2024
Northbound gaurdrail installation, Nov. 2024





Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
zero