Treasure Coast Header Image

Treasure Coast Rumble Strips Improvements Project

Financial Number: 452227-1-52-01

Project Length: 127.7 miles

Project Limits: Along multiple roadway corridors in Martin, St. Lucie, and Indian River Counties.

Virtual Public Meeting: N/A

In-Person Construction Open House: N/A

Start Date: October 20, 2024

Completion Date: Spring 2025

Contractor: TRP Construction Group, LLC

Estimated Construction Cost: $1,600,545

Scope of Work:

The project improvements consist of Installing rumble strips and replacing pavement markings along 11 different roadway corridors within Martin, St. Lucie, and Indian River Counties to enhance the safety of motorists. The rumble strips are ground-in to the roadway and they provide auditory and vibratory feedback when driven over and alert drivers when they drift outside of travel lanes. Rumble strips are one of the most effective safety countermeasures to reduce run-off-the-road and head-on crashes.

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Documents:

PDF IconTC Rumble Strips_ProjectInformationFlyer.pdf

 

Project Photos

Pre-Construction

Click to view enlarged version/details
SR 710 SW Martin Hwy east of SW Allapattah Rd in Martin County





Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone