Financial Number: 452227-1-52-01
Project Length: 127.7 miles
Project Limits: Along multiple roadway corridors in Martin, St. Lucie, and Indian River Counties.
Virtual Public Meeting: N/A
In-Person Construction Open House: N/A
Start Date: September 22, 2024
Completion Date: Spring 2025
Contractor: TRP Construction Group, LLC
Estimated Construction Cost: $1,600,545
Scope of Work:
The project improvements consist of Installing rumble strips and replacing pavement markings along 11 different roadway corridors within Martin, St. Lucie, and Indian River Counties to enhance the safety of motorists. The rumble strips are ground-in to the roadway and they provide auditory and vibratory feedback when driven over and alert drivers when they drift outside of travel lanes. Rumble strips are one of the most effective safety countermeasures to reduce run-off-the-road and head-on crashes.
Point of Contact:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
Documents:
TC Rumble Strips_ProjectInformationFlyer.pdf
|