Current Construction Lane Closures in Northwest Broward County
-
Lighting Improvements Project in Coral Springs, Margate, Pompano Beach, Deerfield Beach and Fort Lauderdale
Traffic Impact:
All lanes are open.
Lighting Improvements in Tamarac, Lauderhill, Fort Lauderdale, Oakland Park, Lauderdale-by-the-Sea, Lauderdale Lakes, Sunrise and Wilton Manors
Traffic Impact:
All lanes are open.
SR 25/US 27 Shoulder Widening Project, North of Weston
Traffic Impact:
Northbound US 27, from I-75 to the Broward and Palm Beach County Line, will have the shoulder closed daily, as needed.
Southbound US 27, from the Palm Beach County Line to I-75 in Broward, may have one lane closed daily, as needed.
Lyons Road Mobility Improvement Project from the C-14 Canal to the Sawgrass Expressway in the city of Coconut Creek
Traffic Impact:
One lane in each direction along Lyons Road from Atlantic Boulevard to Sawgrass Expressway will be closed intermittently, Monday through Friday, between 8:30 a.m. to 4:30 p.m., for signalization, irrigation work, sidewalk installation, milling and resurfacing.
One in each direction along Lyons Road from Atlantic Boulevard to Sawgrass Expressway, will be closed intermittently Monday through Friday, between 9:30 p.m. to 5:30 a.m., for pavement marking and pattern pavement installation.
Lighting Improvements in Fort Lauderdale, Lauderdale-by-the-Sea, Plantation, Sunrise and Lauderhill
Traffic Impact:
All lanes are open.
SR 817/University Drive Mobility Improvements Project in Coral Springs
Traffic Impact:
The inside southbound lane along University Drive from 32nd Street to NW 28th Street will be continuously closed through April to perform roadway widening.
The inside northbound lane along University Drive from NW 28th Street to 32nd Street will be closed Monday through Friday, between 9 a.m. and 4 p.m.
The outside southbound lane along University Drive from Sample Road to NW 32nd Street will be continuously closed through April for the installation of drainage.
The outside right-turn lane from eastbound Sample Road to southbound University Drive will be continuously closed through April for the installation of drainage.
The outside right-turn lane from northbound of University Drive to eastbound Sample Road will be temporarily closed Monday through Friday, between 9 a.m. and 4 p.m.
Up to two lanes in each direction along University Drive from NW 28th Street to Sample Road will be closed nightly, Sunday through Thursday, between 9 p.m. and 5:30 a.m.
SR 7/US 441 and SR 858/Hallandale Beach Boulevard Transit Improvements Project in Miramar, West Park, Hollywood, Plantation, Fort Lauderdale, Davie, Lauderhill, Coral Springs, Lauderdale Lakes, Margate, North Lauderdale, Coconut Creek
Virtual Public Meeting: Thursday, April 7, 2022, from 5 p.m. to 6 p.m. To attend this meeting please use the following link: https://tinyurl.com/SR-7-VPM or dial into (415) 655-0060, Access Code: 535-479-138.
Construction Open House: Thursday, April 7, 2022, from 6 p.m. to 7 p.m. at the City of Miramar Multi-Service Complex located at 6700 Miramar Parkway, Miramar, FL 33023.
|