Financial Number:
430566-1-52-01
Project Length: 0.084 miles
Project Limits: Hillsboro Boulevard Bridge over the Intracoastal Waterway
Start Date: April1, 2016
Completion Date: July 8, 2016
Contractor: Sea Coast Inc.
Estimated Construction Cost: $594,926.74
Scope of Work
The improvements under this project consist of adding new bicycle friendly riding surface plates to the outside lane of the bridge in each direction, replacing the aluminum textured sidewalk plates on both sides of the bridge to provide an improved walking surface, improving existing maintenance hatches and platforms on the bridge, and improving the existing span locks.
Hillsboro Boulevard Bridge Improvements Project in Deerfield Beach
|