Financial Number: 449257-1-52-01
Project Length: 0.207 mile
Project Limits: East Las Olas Boulevard over Intracoastal Waterway
In-Person and Virtual Public Meeting: Thursday November 14, 2024, 6:00 p.m. at the ArtServe located at 1350 East Sunrise Boulevard, Fort Lauderdale, Florida 33304
To participate in the virtual public meeting, use the link below to register:
Participants can also dial in using their phone: https://tinyurl.com/LasOlasMeeting
Dial-in Number: +1(562) 247-8422
Access Code: 752-121-911
Projected Letting: Spring 2025
Anticipated Start Date: Spring 2026
Anticipated Completion Date: Spring 2027
Estimated Construction Cost: $12 M
Scope of Work:
- Replace old deck with new solid surface aluminum deck
- Paint the movable bridge deck and fascia elements
- Replace important electrical components and wiring
- Replace the mechanical span locks which connect the two halves of the movable bridge deck when the bridge is in the "down" position
- Replace the existing navigation/marine fenders in the waterway, including replacement of the timber piles and support beams
- Renovate the bridge tender house
- Minor repaving of the roadway at ends of the bridge and restore traffic monitorng site
Construction Impacts:
- Work will be done in phases to minimize impacts to the community
- Full and partial bridge closures will occur during phases for the fender construction and deck replacement, respectively; and detours will be provided utilizing Sunrise Boulevard, SR 5/US-1, and SR A1A
- Full bridge closures will occur during non-peak (i.e., nighttime) hours, and will not occur during major special events
- Each phase requiring a full (nighttime only) or partial bridge closure is expected to be one month or less
- Temporary lane closures will be required for some phases (such as bridge painting, and minor repaving) and will occur during non-peak hours
- Pedestrian traffic will be maintained on the side of the bridge opposite from any ongoing construction
- Access to properties on both sides of the bridge will be maintained during construction
- Marine vessel traffic will be maintained with temporary closure on half the channel during fender construction
- Modification to the draw bridge operation schedule will be coordinated with the United States Coast Guard
Documents:
4492571_Flyer.pdf
Contact Information:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
|