North 22 Avenue/SW 12 Avenue Complete Streets Project

Project County: Broward County

Financial Number: 445526-1-52-01

Project Length: 1.027 Miles

Project Limits: North 22 Avenue/SW 12 Avenue from State Road (SR) 822/Sheridan Street to SR 848/Stirling Road

Project Purpose: This Complete Streets Project will resurface the asphalt pavement and improve bicycle and pedestrian safety throughout the corridor.

A Public Meeting Was Held: Thursday, September 26, 2024, at 6:00 p.m. and was offered in-person and virtually simultaneously.

The in-person public meeting took place at the Hotel Dello Fort Lauderdale Airport located at 28 South Federal Highway, Dania Beach, Florida 33004.

The Virtual public meeting was held via GoToWebinar.

The public meeting consisted of a formal presentation followed by an open discussion. Staff was available to answer questions and provide assistance. Comments and questions were answered in the order received. Questions not answered during the event, will receive a response via writing following the meeting. Questions and comments may also be submitted prior to the meeting by contacting the Project Manager.

Click Here to View a Recording of The Public Meeting: https://youtu.be/P3K_2AzVvmE

Anticipated Construction Start Date: Fall 2025

Anticipated Construction End Date: Winter 2027

Estimated Construction Cost: $3.5 million

Scope of Work:

  • Repave and restripe the existing roadway within the project limits
  • Install speed tables at various locations along the project corridor
  • Install three raised intersections at SW 10 Street, SW 8 Street and SW 7 Street
  • Upgrade signing and pavement markings including the addition of shared lane markings (sharrows) which indicate that cyclists should be expected in the lane
    • Click here for more information.
  • Upgrade existing curb ramps and sidewalks to comply with Americans with Disabilities Act (ADA) standards
  • Install roadway lighting along both sides of the roadway

Construction Impacts:

  • Partial side street detours will be required to complete the raised intersections at SW 10 Street, SW 8 Street, and SW 7 Street
  • Work will be done in phases to reduce the effects of construction on the community
  • Temporary lane closures will be required during construction. Lane closures will be performed at off-peak hours
  • Access to properties will be maintained during construction

Contact Information:
Para información y preguntas en Español, por favor llame al (954) 777-4302.

Documents:

PDF Icon445526-1 - Flyer - N 22 Avenue-Invitation.pdf

PDF Icon445526-1 - Powerpoint Presentation.pdf

 

Project Photos

Pre-Construction

Speed Table Flagger Operation Raised Intersection Flagger Operation Project Overview East Side Closure
West Side Closure

During Construction

Click to view enlarged version/details
Existing Raised Intersection (similar to proposed)
 
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero