FDOT District Four - Broward County Header Image

State Road (SR) 5/US 1 from SR 870/Commercial Boulevard to SE 7th Street

Financial Number: 446188-1-52-01

Project Length: 2.52 Miles

Project Limits: State Road (SR) 5/US 1 from SR 870/Commercial Boulevard to SE 7th Street

Public information meeting: The public information meeting will be offered in two different formats: virtual and in-person. The virtual public information meeting will take place on, Wednesday, September 7, 2022, at 5:30 p.m. The in-person public information meeting will take place on Tuesday, September 13, 2022, from 5:30 p.m. – 7:30 p.m.

To participate in the virtual public information meeting from your computer, tablet or smartphone please register using the link below:

https://attendee.gotowebinar.com/register/770910908363837198.

Participants can also use their phone by dialing in to +1 (631) 992-3221; Access code: 757-584-836.

The in-person public information meeting will be held at the Beach Branch Library located at 3250 NE 2 Street, Pompano Beach, Florida 33062. The latest social distancing guidelines will be followed.

Start Date: Fall 2023

Completion Date: Spring 2025

Estimated Construction Cost: $4.5 Million

Scope of Work:

  • Repave the existing travel lanes.
  • Install new signing and pavement markings.
  • Reduce width of the existing travel lanes to create space for bicycle lanes.
  • Replace and upgrade existing curb ramps to comply with Americans with Disabilities Act (ADA) standards.
  • Upgrade existing bridge railing at bridge #860222 over Cypress Creek Canal.
  • Upgrade pedestrian push button countdown detectors at signalized intersections.
  • Upgrade lighting to better illuminate pedestrian crosswalks at signalized intersections.

Project Benefits:

  • Increase the life span of the pavement.
  • Provision of bicycle lanes.
  • Provision of an ADA compliant corridor.
  • Enhance safety.

Construction Impacts:

  • All work will be done in phases to reduce the impact of construction to the community.
  • Temporary lane closures during non-peak hours will occur.
  • There will be no complete road closures.
  • Access to businesses and residences will be maintained at all times.

Documents:

PDF Icon446188-1- SR 5 Flyer

PDF Icon446188-1 VPM Presentation

PDF IconSR 5 from SR 870 Commerical Blvd to SE 7th Street - Flyer

Contact Information:

 

Project Location:

 

Proposed Project Safety Enhancements:

 

Project Photos

Pre-Construction

 
 



Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express