State Road (SR) 816/Oakland Park Boulevard from Rock Island Road to East of NW 31 Avenue

Financial Number: 447675-1-52-01

Project Length: 2.73 Miles

Project Limits: State Road (SR) 816/Oakland Park Boulevard from Rock Island Road to East of NW 31 Avenue

Project Purpose: The Resurfacing, Restoration and Rehabilitation (RRR) project will extend the service life of the pavement, enhance roadway safety, and improve operating characteristics of the corridor.

A Public Meeting Was Held: Thursday, March 7, 2024, at 6:00 p.m. The public meeting was conducted both in-person and virtually simultaneously.

The in-person public meeting was held at the City of Lauderdale Lakes/Educational and Cultural Center, located at 3580 W Oakland Park Boulevard, 2nd Floor, Lauderdale Lakes, Florida 33311, doors open at 5:30 p.m.

The virtual public meeting was held via GoToWebinar.

Participants attended in-person and virtually. The public meeting consisted of a formal presentation followed by an open discussion. Staff were available to answer questions and provide assistance. Comments and questions were answered in the order received.

Public Meeting Recording: https://youtu.be/JfxMzjfycik

Anticipated Construction Start Date: Fall 2025

Anticipated Completion Date: Late 2026

Estimated Construction Cost: $7.5 Million

Scope of Work:

  • Repave and restripe the existing roadway within the project limits.
  • Update deficient curb ramps/detectable warning surfaces to comply with the Americans with Disabilities Act (ADA) to enhance safety for all pedestrians.
  • Improve access to bus stops and add landing pads where missing to improve transit connectivity.
  • Upgrade signing and pavement markings.
  • Modify existing signals to increase signal visibility and reduce rear-end crashes.
  • Modify signal timing to improve efficiency and maximize throughput capacity.
  • Update corridor lighting to comply with current required illumination levels.

Construction Impacts:

  • Work will be done in phases to reduce the effects of construction on the community.
  • Temporary lane closures will be required:
    • A single lane on both sides of the roadway can be closed any time during the day except within 600-feet of signalized intersections.
    • Two lanes can be closed only at nighttime from 8 p.m. to 6 a.m. except within 600-feet of signalized intersections.
    • Within 600-ft of signalized intersections, a single lane can be closed only at nighttime from 8 p.m. to 6 a.m. and two lanes can be closed from 10 p.m. to 5 a.m.
  • Resurfacing will be done during nighttime hours using one-lane or two-lane closures.
  • Access to businesses and residences will be always maintained.
  • No detours are expected.

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Documents:

PDF Icon447675-1 - Flyer - SR-816-Oakland Park Blvd

 

Pre Construction:

Click to view enlarged version/details
 
 
Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero