State Road (SR) 842/Broward Boulevard from west of NW 42 Avenue to SW 22 Avenue and SR 842/Broward Boulevard

Financial Number: 446094-1-52-01, 446094-1-52-02, and 441799-1-52-01

Project Length: 2.008 miles

Project Limits: State Road (SR) 842/Broward Boulevard from west of NW 42 Avenue to SW 22 Avenue and SR 842/Broward Boulevard from SR 7/US-441 to 27 Avenue

Public Meeting: The Public Meeting was held on Thursday, February 24, 2022, at 6:00 PM, and was offered in two different formats at the same time: virtual and in-person.

The virtual (online) Public Meeting was held via GoToWebinar.

https://attendee.gotowebinar.com/register/1430215457268341520.

Participants can also use their phone by dialing in to +1 (951) 384-3421; Access code: 263-168-234.

The in-person public meeting took place at the Hampton Inn Fort Lauderdale, located at 250 N Andrews Ave, Fort Lauderdale, FL 33301. The latest social distancing guidelines were followed.

Both formats consisted of a formal presentation followed by an open discussion.

FDOT encourages public participation without regard to race, color, national origin, age, sex, religion, disability or family status.

To view a recording of the public meeting, please click on the below link.

Public Meeting Recording:

Click here: https://youtu.be/aC5F4QeRP0o

PROPOSED IMPROVEMENTS

  • Repaving the existing roadway
  • Replacing of existing failing paver crosswalks with regular asphalt
  • Replacing and upgrading existing curb ramps to comply with Americans with Disabilities Act (ADA) standards
  • Upgrading signing and pavement markings
  • Upgrading pedestrian signals and detectors
  • Install Adaptive Traffic Signal System at intersections to enhance traffic mobility

SAFETY IMPROVEMENTS

  • NW 42 Avenue: Modifying the existing median opening to an eastbound left-turn only (remove the existing southbound left-turn)
  • SR 7/US 441: Lengthen the eastbound left-turn lanes
  • 31 Avenue and 27 Avenue: Lengthen the eastbound and westbound left-turn lanes
  • 24 Avenue: Lengthen the westbound left-turn lane
    • Signalization upgrades consisting of the following:
    • Adding additional signal heads with backplates to improve signal visibility
  • Replacing 5-section signal heads serving left-turn movements in the eastbound and westbound directions with 4-section signal heads that display flashing yellow arrow
  • New roadway lighting along the north side of Broward Boulevard between SR 7/US 441 and 27 Avenue
  • Replacing existing lighting fixtures to Light Emitting Diode (LED) fixtures

Construction Impacts:

  • Temporary lane closures on Broward Boulevard will be needed during off-peak hours and short-term detours of side street traffic will be necessary for replacement of the paver crosswalks
    • Off-peak hours are from 9:00 PM to 6:30 AM, Sunday through Thursday nights
  • Access to adjacent properties will be maintained at all times

Construction Information:

  • Construction Start Date: Spring 2023
  • Anticipated Completion: Spring 2024
  • Construction Cost Estimate: $6.0 Million
Documents:

PDF IconResurfacing, Restoration, and Rehabilitation (RRR) Project

Contact Information:

 
 
 


Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express