FDOT District Four - Broward Header Image

State Road (SR) 842/Broward Boulevard from west of NW 42 Avenue to SW 22 Avenue and SR 842/Broward Boulevard

Financial Number: 446094-1-52-01, 446094-1-52-02, and 441799-1-52-01

Project Length: 2.008 miles

Project Limits: State Road (SR) 842/Broward Boulevard from west of NW 42 Avenue to SW 22 Avenue and SR 842/Broward Boulevard from SR 7/US-441 to 27 Avenue

Public Meeting: The Public Meeting was held on Thursday, February 24, 2022, at 6:00 PM, and was offered in two different formats at the same time: virtual and in-person.

The virtual (online) Public Meeting was held via GoToWebinar.

https://attendee.gotowebinar.com/register/1430215457268341520.

Participants can also use their phone by dialing in to +1 (951) 384-3421; Access code: 263-168-234.

The in-person public meeting took place at the Hampton Inn Fort Lauderdale, located at 250 N Andrews Ave, Fort Lauderdale, FL 33301. The latest social distancing guidelines were followed.

Both formats consisted of a formal presentation followed by an open discussion.

FDOT encourages public participation without regard to race, color, national origin, age, sex, religion, disability or family status.

To view a recording of the public meeting, please click on the below link.

Public Meeting Recording:

Click here: https://youtu.be/aC5F4QeRP0o

PROPOSED IMPROVEMENTS

  • Repaving the existing roadway
  • Replacing of existing failing paver crosswalks with regular asphalt
  • Replacing and upgrading existing curb ramps to comply with Americans with Disabilities Act (ADA) standards
  • Upgrading signing and pavement markings
  • Upgrading pedestrian signals and detectors
  • Install Adaptive Traffic Signal System at intersections to enhance traffic mobility

SAFETY IMPROVEMENTS

  • NW 42 Avenue: Modifying the existing median opening to an eastbound left-turn only (remove the existing southbound left-turn)
  • SR 7/US 441: Lengthen the eastbound left-turn lanes
  • 31 Avenue and 27 Avenue: Lengthen the eastbound and westbound left-turn lanes
  • 24 Avenue: Lengthen the westbound left-turn lane
    • Signalization upgrades consisting of the following:
    • Adding additional signal heads with backplates to improve signal visibility
  • Replacing 5-section signal heads serving left-turn movements in the eastbound and westbound directions with 4-section signal heads that display flashing yellow arrow
  • New roadway lighting along the north side of Broward Boulevard between SR 7/US 441 and 27 Avenue
  • Replacing existing lighting fixtures to Light Emitting Diode (LED) fixtures

Construction Impacts:

  • Temporary lane closures on Broward Boulevard will be needed during off-peak hours and short-term detours of side street traffic will be necessary for replacement of the paver crosswalks
    • Off-peak hours are from 9:00 PM to 6:30 AM, Sunday through Thursday nights
  • Access to adjacent properties will be maintained at all times

Construction Information:

  • Construction Start Date: Spring 2023
  • Anticipated Completion: Spring 2024
  • Construction Cost Estimate: $6.0 Million
Documents:

PDF IconResurfacing, Restoration, and Rehabilitation (RRR) Project

Contact Information:

 
 
 


Please click on a link below to view construction projects
in other areas of Broward County:
I-95 Palm Beach CountyInterstates Northern Palm Beach CountyNortheast Western Palm Beach CountyNorthwest
I-95 Palm Beach CountySoutheast Northern Palm Beach CountySouthwest
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express
zero