Financial Number: 445524-1-52-01
Project Length: 1.34 Miles
Project Limits: Utopia Drive from Riviera Blvd. to Pembroke Rd.
Public Meeting: Meeting to be held at Miramar Branch Library 2050 Civic Center Place, Miramar, FL 33025 December 11, 5:00 pm – 6:00 pm in-person and virtually
Projected Letting:
July 2025
Anticipated Construction Start Date: Fall 2025
Anticipated Completion Date: Fall 2026
Estimated Construction Cost: $981,365.00
Scope of Work:
- Reconstructing existing pathway
- Installing guardrail at each intersecting road for increased pedestrian and automobile safety
- Replacing damaged light poles
- Re-furnishing pathway with new benches
- Upgrading signage within project limits
Construction Impacts:
- Work will be done in phases to reduce the impacts to the community
- Temporary lane closures will occur one lane at a time during non-peak hours to minimize impacts on traffic
- Pedestrian traffic will be maintained at all times
- Access to properties along the corridor will be maintained at all times
Contact Information:
Para información y preguntas en Español, por favor llame al (954) 777-4302.
Documents:445524-1-52-01 - Utopia - Meeting Flyer_WITH MPO.pdf
|