Current Construction Lane Closures in Martin County

-

State Road 714/SW Martin Highway Widening Project

Traffic Impact:

The eastbound and westbound shoulders on SR 714/SW Martin Highway from SW Martin Downs Boulevard to SW Citrus Boulevard are closed through mid-2024 to facilitate widening activities. Cyclists and motorists should share the road.

One lane in either direction of SR 714/SW Martin Highway from Citrus Boulevard to Martin Downs Boulevard may be closed, Tuesday, May 30, through Thursday, June 1, between 7 p.m. to 6 a.m., for roadway construction and pipe installation. During this time, intermittent side street closures may occur, and two-way traffic will be maintained by a flagging operation.

Advanced Notice: Northbound Florida’s Turnpike from SR-706/Indiantown Road (Exit 116) in Palm Beach County to Becker Road (Exit 138) in St. Lucie County, will be closed to traffic nightly, from 10:30 p.m. until 5:30 a.m., Wednesday, June 7 through Thursday, June 8 for bridge widening work. Northbound Florida’s Turnpike entrance ramp from SR-714/Martin Highway will also be closed nightly during this operation. Advance notice and detour signage will be in place to assist motorists.

Detour Information:

Motorists traveling northbound from SR-706/Indiantown Road traffic will be detoured via the I-95 northbound entrance ramp to Becker Road (Exit 114). Motorists can re-enter the Florida Turnpike Highway System via Becker Road east.

Eastbound and westbound SR-714/Martin Highway traffic will be detoured via the I-95 northbound entrance ramp to Becker Road (Exit 114). Motorists can re-enter the Florida Turnpike Highway System via Becker Road east. Please see flyer attached for more information.

Beginning Wednesday night, May 31, southbound Florida’s Turnpike between Becker Road (Exit 138) in St. Lucie County and SR 714/Martin Highway (Exit 133) in Martin County, will be closed to traffic overnight, 10:30 p.m. until 5:30 a.m., through Thursday night, June 1 for bridge widening work. Advance notice and detour signage will be in place to assist motorists.

Detour Information:

Westbound Becker Road traffic will be detoured via the I-95 southbound entrance ramp to SR-706/Indiantown Road.

The southbound Florida’s Turnpike entrance ramp from SR-714/Martin Highway will not be impacted and will remain accessible during this operation. Please see flyer attached for more information. For more information, please contact Community Outreach Specialist Samantha Kayser at 772-579-5479.

State Road (SR) 76/Kanner Highway Resurfacing Project

Traffic Impact:

The sidewalk on southbound SR 76/Kanner Highway between SR 5/U.S. 1 and SR 714/Monterey Road is closed through Friday, June 16, to facilitate roadway and drainage work. Pedestrians are directed to use the signalized crossings at the intersections of SR 714/Monterey Road and SR 5/U.S. 1 to access the sidewalk on northbound SR 76/Kanner Highway.

One southbound outside lane of SR 76/Kanner Highway from the Monterey Road intersection to SR 5/U.S. 1 may be closed around the clock through Friday, June 16, for drainage, utility, sidewalk, and lighting work, except during Memorial Day weekend.

One northbound outside lane of SR 76/Kanner Highway from the parking entrance to Water’s Edge Dermatology south of the Monterrey Road intersection to SE Lonita Street will be closed from 8 a.m. to 4 p.m. as needed, through Friday, June 16, for lighting, signalization, and site restoration work.

Two southbound lanes of SR 76/Kanner Highway from the intersection of Monterey Road to SR 5/U.S. 1 will be closed nightly Tuesday, May 30 through Friday, June 2 and Monday through Friday, through Friday, June 16, from 8 p.m. to 6:30 a.m. for drainage, utility, sidewalk, and lighting work.

One northbound inside lane of SR 76/Kanner Highway from SR 5/U.S. 1 will be closed from 8 a.m. to 6:30 p.m. as needed Tuesday, May 30 through Friday, June 16, for signage installation work.

Two southbound lanes of SR 76/Kanner Highway from S Manor Drive to SE Seville Street will be closed around-the-clock from 8:30 p.m. Friday night through 6 a.m. Monday morning on the following dates for drainage work:

Friday night, June 2 through Monday morning, June 5

Friday night, June 9 through Monday morning, June 12

Advanced Notice: Beginning at 8 p.m. Friday, June 2, southbound SR 76/Kanner Highway at the intersection of SR 5/U.S. 1, will be closed around-the-clock through approximately 6:30 a.m., Monday, June 5, for watermain and roadway work. Friday, June 9 through Monday, June 12 will be used as contingency dates if needed. Please see flyer attached.

Detour Information:

Southbound SR 5/U.S. 1 traffic will be detoured via SR 714/Monterey Road to SR 76/Kanner Highway

Northbound SR 5/U.S. 1 traffic will be detoured via SR 714/Monterey Road to SR 76/Kanner Highway.

Beginning at 6 p.m., Monday, May 22, the entrance to Poppleton Creek at southbound SR 76/Kanner Highway, will be closed around-the-clock through approximately 10 a.m., Monday, June 19, for watermain work. Monday, June 19 through Monday, June 26 will be used as contingency dates if needed. Please see flyer attached.

Detour Information:

Northbound SR 76/Kanner Highway traffic will be detoured via SR 714/Monterey Road and SW Palm City Road to the Poppleton Creek entrance at SW Riverview Street.

Southbound SR 76/Kanner Highway traffic will be detoured via SR 5/U.S. 1 and SW Palm City Road to the Poppleton Creek entrance at SW Riverview Street.

Southbound SR 5/U.S. 1 traffic will be detoured via SW Palm City Road to the Poppleton Creek entrance at SW Riverview Street. For more information, please contact Community Outreach Specialist Samantha Kayser at 772-579-5479.

State Road (SR) 5/US-1 Resurfacing Project, from SE Contractors Way to north of SR-732/Jensen Beach Boulevard

Virtual Public Meeting and In-Person Construction Open House: A Virtual Public Meeting and In-Person Construction Open House will be held on Thursday, June 1, 2023. Please see below and the flyer attached for more information.

The Virtual Public Meeting will be held from 5:00 p.m. to 6:00 p.m. Please use the following link to register: https://bit.ly/3VlbsaI or dial (562) 247-8422, Access Code: 224-525-117 to join the meeting. A brief presentation followed by questions and comments will be held from 5:00 p.m. to 5:30 p.m., and again from 5:30 p.m. to 6:00 p.m. Please note questions and comments may be submitted via the online chat for the project team to address directly.

The In-Person Construction Open House will be held from 6:00 p.m. to 7:00 p.m. at the Stuart City Commission, Commission Chambers, located at 121 SW Flagler Avenue, Stuart, FL 34994. This meeting will have an informal open house format, with project representatives available to answer questions and address comments at any time during the meeting. For more information, please contact Community Outreach Specialist Samantha Kayser at 772-579-5479.

MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS

MARTIN COUNTY

Traffic Impact: (Hobe Sound, Palm City, City of Stuart, Stuart, Jensen Beach, Jupiter Island, Port Salerno, Port Mayaca, Rio, Indiantown, Tequesta, Town of Sewall’s Point)

JENSEN BEACH:

Traffic Impact: Northbound U.S. 1 between NW Sunset Boulevard and NW Goldenrod Road, in Jensen Beach, 9 a.m. to 4 p.m., Tuesday, May 30 through Friday, June 2, 1 of 3 lanes closed, for utility work. For more information, please contact Mike Dexter at 772-251-8210.

Traffic Impact: Northbound U.S. 1 between NW Sunset Boulevard and NW Goldenrod Road, in Jensen Beach, 9 p.m. to 6 a.m., Tuesday, May 30 through Thursday, June 1, 1 of 3 lanes closed, for asphalt installation. For more information, please contact Mike Dexter at 772-251-8210.

Traffic Impact: STUART:

Traffic Impact: Northbound and southbound SW Kanner Highway between SW Locks Road and SW Tropical Avenue, in Stuart, 9 a.m. to 4 p.m., through Wednesday, May 31, 2 of 4 lanes intermittently closed, for construction of additional turn lanes and new sidewalk. During this time, the sidewalk along southbound SW Kanner Highway will be closed and pedestrian detours will be in place. For more information, please contact Ted Hojara at 561-373-0602.

Traffic Impact: Southbound U.S. 1 between SE Luckhardt Street and SE Monterey Road, in Stuart, 9 a.m. to 4 p.m., Tuesday, May 30 through Friday, June 2,1 of 3 lanes closed, for FP&L utility pole removal. For more information, please contact Rafael Ureña at 772-882-5084.

Traffic Impact: Southbound U.S. 1 between NW Goldenrod Road and NW River Shores Boulevard, in Stuart, 9 a.m. to 4 p.m., Tuesday, May 30 through Friday, June 2,1 of 3 lanes closed, for FP&L utility pole removal. For more information, please contact Rafael Ureña at 772-882-5084.

Traffic Impact: Northbound U.S. 1 between Lillian Court and SE Emerald Lakes Way, in Stuart, 9 a.m. to 4 p.m., Tuesday, May 30 through Friday, June 2,1 of 3 lanes closed, for FP&L utility pole installation and wiring operations. For more information, please contact Rafael Ureña at 772-882-5084.

Traffic Impact: Southbound U.S. 1 between SE Casa Avenue to SE Luckhardt Street, in Stuart, 9 a.m. to 4 p.m., Monday, May 1 through Friday, June 9, 1 of 3 lanes closed, for utility work. For more information, please contact Mario Sagastume at 703)-929-2256.

Traffic Impact: Eastbound and westbound SR 714/SW Martin Highway between east of SW Stuart W Boulevard and west of SW Citrus Boulevard, in Stuart, 9 a.m. to 4 p.m., Monday through Friday, beginning Thursday, June 1 through Monday, June 12, 1 of 2 lanes closed, for pavement coring work. A flagging operation will be in place to help direct motorists. For more information, please contact Andy Tao at 954-347-9008.

BRIGHTLINE:

Traffic Impact: Jensen Beach – Riverview Drive. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit Riverview Drive. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Jensen Beach – Skyline Drive. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit Skyline Drive. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Jensen Beach – NE Jensen Beach Boulevard. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NE Jensen Beach Boulevard. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Jensen Beach – NE Dixie Highway. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NE Dixie Highway. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Jensen Beach – Railroad Crossing at Jensen Beach Boulevard. Continuous alternating lane closures at roundabout, 7 a.m., Monday, May 15 to 7 p.m., Friday, May 26.

Detour Information:

Traffic Impact:

Motorists and pedestrians are encouraged to follow detour routes, which will vary based on specific lane closures. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Stuart – Alice Street. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NW Alice Street. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Stuart – NW Fern Street. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NW Fern Street. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Stuart – West of SE Dixie Highway/A1A between SE Decker Avenue and SE Monterey Road. Daytime southbound shoulder closures for concrete pouring, Monday to Friday, 7 a.m. to 3 p.m. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Stuart – Railroad Crossing at Colorado Avenue. Full closure of Colorado Avenue/SW Ocean Boulevard roundabout 7 a.m., Tuesday, May 30 to 7 p.m., Friday, June 9.

Detour Information:

Traffic Impact:

Northbound Colorado Avenue traffic will be directed to travel west on 5th Street, to Camden Avenue, travel north on Camden Avenue to Dixie Highway, travel north on Dixie Highway to St. Lucie Avenue and travel east on St. Lucie Avenue to Osceola Street.

Traffic Impact:

Southbound Colorado Avenue traffic will be directed to travel west on Seminole Street to St. Lucie Avenue, travel west on St. Lucie Avenue to Akron Avenue, travel south on Akron Avenue to 5th Street, travel east on 5th Street to Camden Avenue and travel south on Camden Avenue to 6th Street.

Traffic Impact:

Eastbound SE Ocean Avenue traffic will be directed to travel north on Old Dixie Highway to St. Lucie Avenue and travel east on St. Lucie Avenue to Osceola Street.

Traffic Impact:

Westbound SE Ocean Avenue traffic will be directed to travel north on Denver Avenue to Osceola Street, travel west on Osceola Street to Colorado Avenue, travel north on Colorado Avenue, Seminole Street, travel west on Seminole Street to St. Lucie Avenue and travel west on St. Lucie Avenue to Akron Avenue. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: St. Lucie River Railroad Bridge Rehabilitation.

Traffic Impact: Overnight bridge closures: 8 p.m. to 6 a.m., Monday, May 22 to Monday, May 29.

Traffic Impact:

Drawbridge to remain in the down position overnight; no boat passage for vessels requiring an opening of the drawbridge. Vessels able to pass without an opening may do so at any time. Exercise caution.

Traffic Impact:

Bridge will remain in the up (open) position from 6 a.m. to 7 a.m. and 7 p.m. to 8 p.m. daily.

Traffic Impact:

Normal operations from 7 a.m. to 7 p.m.

Traffic Impact:

Drawbridge returns to full normal operations 6 a.m., Monday, May 29. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Continuous flagging operations and train testing up to 110 MPH. Daytime testing through 22 miles and 14 railroad crossings, 7 a.m. to 7 p.m., Wednesday, May 31 through Sunday, June 4. Crossings in italics: high speed testing will NOT occur through nine crossings between Jensen Beach Boulevard (SR 707A) and Monterey Road, flaggers will not be present at these crossings. Additional testing is expected in June and July. Further details on dates and locations to follow.

Traffic Impact:

County Line Road

Traffic Impact:

Skyline Drive (CR 722)

Traffic Impact:

NE 1st Street/Pitchford Landing

Traffic Impact:

Jensen Beach Boulevard (SR 707A)

Traffic Impact:

Palmetto Avenue

Traffic Impact:

SR A1A/ DR 707

Traffic Impact:

NE Alice Street

Traffic Impact:

Fern Street

Traffic Impact:

Second Street

Traffic Impact:

Colorado Avenue (SR 76/ SR 10)

Traffic Impact:

Pinewood (MLK JR/ SR 10)

Traffic Impact:

Florida Street

Traffic Impact:

SR A1A

Traffic Impact:

Monterey Road

Traffic Impact:

Indian Street (SR A1A)

Traffic Impact:

Seaward Street

Traffic Impact:

Salerno Road (CR 722)

Traffic Impact:

Broward Avenue

Traffic Impact:

Cove Road (SR A1A)

Traffic Impact:

SR A1A

Traffic Impact:

For more information, please contact Katie Mitzner at 407-502-3587.


Please click on a link below to view lane closures in other areas of the Treasure Coast:
I-95 Palm Beach CountyMartin County Northern Palm Beach CountySt. Lucie County Western Palm Beach CountyIndian River County
 
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone