Current Construction Lane Closures in Martin County

January 27 - February 03, 2023


State Road 714/SW Martin Highway Widening Project

Traffic Impact:

  • The eastbound and westbound shoulders on SR 714/SW Martin Highway from SW Martin Downs Boulevard to SW Citrus Boulevard are closed through mid-2024 to facilitate widening activities. Cyclists and motorists should share the road. For more information, please contact Community Outreach Specialist Samantha Kayser at 772-579-5479.

State Road (SR) 5/US Highway (US) 1 Resurfacing Project

Traffic Impact:

  • One lane in each direction on SR 5/U.S. 1 from NW Jensen Beach Boulevard to the Martin County/St. Lucie County line will be closed Monday, Jan. 23 through Friday, Jan. 27, from 9 a.m. to 4 p.m., for lighting and signalization work. For more information, please contact Community Outreach Specialist Samantha Kayser at 772-579-5479.

State Road (SR) 76/Kanner Highway Resurfacing Project

Traffic Impact:

  • One southbound outside lane of SR 76/Kanner Highway from the Monterey Road intersection to SR 5/U.S. 1 may be closed around the clock through Tuesday, Feb. 28, for drainage, utility, sidewalk, and lighting work.

  • One northbound outside lane of SR 76/Kanner Highway from the parking entrance to Water’s Edge Dermatology south of Monterrey Intersection to SE Lonita Street will be closed from 8 a.m. to 4 p.m. as needed, through Wednesday, Feb. 8, for lighting, signalization, and site restoration work.

  • Two northbound outside lanes of SR 76/Kanner Highway from the Monterey Road intersection to SR 5/U.S. 1 will be closed nightly from 8 p.m. to 6:30 a.m. through Thursday Jan. 26, for lighting work and milling and resurfacing the roadway.

  • Two southbound lanes of SR 76/Kanner Highway from the intersection of Monterey Road to SR 5/U.S. 1 will be closed nightly Monday through Friday, through Tuesday Feb. 28, from 8 p.m. to 6:30 a.m. for drainage, utility, sidewalk, and lighting work.

  • One westbound lane of SR 714/SW Monterey Road from the Monterey Shopping Plaza driveway to the European Kitchen and Bath driveway may be closed from 8 a.m. to 4 p.m., as needed, through Wednesday, Feb. 8, for lighting, foundation work.

  • One eastbound lane of SR 714/SW Monterey Road from the Riverwatch Marina to the WAWA driveway entrance will be closed from 8 a.m. to 4 p.m. as needed, through Wednesday, Feb. 8, for lighting work.

  • One northbound lane of SR 76/S Kanner Highway from SR 5/U.S. 1 to Seacoast Bank Court will be closed from 8 a.m. to 6:30 p.m. as needed, through Wednesday, Feb. 8, for lighting, foundation work.

  • One eastbound lane of SR 5/U.S. 1 from the Citgo Gas Station in front of the Twin Plaza Shopping Center to the first driveway entrance to Bank of America Financial Center will be closed from 8 a.m. to 4 p.m. as needed, through Wednesday, Feb. 8, for lighting work.

  • One northbound lane of SR 76/Kanner Highway from SW Cabana Point Circle to Seacoast Bank just north of SR 5/U.S. 1 will be closed nightly Monday through Friday, through Thursday Jan. 26, from 8 p.m. to 6:30 a.m. for milling and resurfacing work.

  • Two northbound outside lanes of SR-76/Kanner Highway from the Monterey Road intersection to SR 5/U.S. 1 will be closed Sunday through Thursday, through Thursday Jan. 26, from 8:30 p.m. to 6 a.m. for lighting work and milling and resurfacing the roadway.

  • Advanced Notice: Beginning at 8 p.m., Friday, Jan. 27, southbound SR 76/Kanner Highway at the intersection of SR 5/U.S. 1, will be closed around-the-clock through approximately 6:30 a.m., Monday, Jan. 30, for watermain and roadway construction. Friday, Feb. 3 through Monday, Feb. 6 will be used as contingency dates if needed.

Detour Information:

  • Southbound SR 5/U.S. 1 traffic will be detoured via SR 714/Monterey Road to SR 76/Kanner Highway.

  • Northbound SR 5/U.S. 1 traffic will be detoured via SR 714/Monterey Road to SR 76/Kanner Highway. Please see flyer attached.

  • Advanced Notice: Beginning at 6 p.m., Tuesday, Jan. 31, the entrance to Poppleton Creek at southbound SR 76/Kanner Highway, will be closed around-the-clock through approximately 10 a.m., Tuesday, Feb. 7, for watermain work. Tuesday, Feb. 7 through Wednesday, Feb. 15 will be used as contingency dates if needed.

Detour Information:

  • Northbound SR 76/Kanner Highway traffic will be detoured via SR 714/Monterey Road and SW Palm City Road to the Poppleton Creek entrance at SW Riverview Street.

  • Southbound SR 76/Kanner Highway traffic will be detoured via SR 5/U.S. 1 and SW Palm City Road to the Poppleton Creek entrance at SW Riverview Street.

  • Southbound SR 5/U.S. 1 traffic will be detoured via SW Palm City Road to the Poppleton Creek entrance at SW Riverview Street. Please see flyer attached. For more information, please contact Community Outreach Specialist Samantha Kayser at 772-579-5479.

State Road (SR) 9/I-95 Weigh In Motion (WIM) Stations Highway Lighting Improvements Project

Traffic Impact:

  • The northbound WIM station located just north of the Indiantown Road interchange is open.

  • The southbound WIM station located just south of the Becker Road interchange is closed around-the-clock through Saturday, June 3, 2023, pending weather and unforeseen circumstances, to remove the existing highway lighting features and install new highway lighting. For more information, please contact Community Outreach Specialist Samantha Kayser at 772-579-5479.

MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS

MARTIN COUNTY

Traffic Impact: (Hobe Sound, Palm City, City of Stuart, Stuart, Jensen Beach, Jupiter Island, Port Salerno, Port Mayaca, Rio, Indiantown, Tequesta, Town of Sewall’s Point)

CITY OF STUART:

Traffic Impact: Northbound and southbound NW Dixie Highway over the Old Roosevelt Bridge, in the City of Stuart, 9 a.m. to 4 p.m., Monday, Jan. 23 through Friday, Jan. 27, 1 of 2 lanes closed, for routine maintenance. For more information, please contact Guillermo Canedo, Communications Manager, FDOT District Four at 954-777-4302.

HOBE SOUND:

Traffic Impact: Northbound U.S. 1 between SE Village Road and SE Seabranch Boulevard, in Hobe Sound, 9 a.m. to 4 p.m., Monday, Jan. 23 through Friday, Jan. 27, 1 of 2 lanes may be closed, for FP&L utility pole installation and wiring operations. For more information, please contact Rafael Ureña at 772-882-5084.

Traffic Impact: Northbound U.S. 1 between SE Turn Lead Trail and SE Mariner Sands Trail, in Hobe Sound, 9 a.m. to 4 p.m., Monday, Jan. 23 through Friday, Jan. 27, 1 of 2 lanes closed, for FP&L utility pole installation and wiring operations. For more information, please contact Rafael Ureña at 772-882-5084.

Traffic Impact: Northbound U.S. 1 between SE Dharlys Street to SE Hobe Terrace, in Hobe Sound, 9 a.m. to 4 p.m., Monday, Jan. 30 through Friday, Feb. 10, 1 of 2 lanes closed, for new turn lane install. For more information, please contact Patrick Shaw at 315-224-6807.

INDIANTOWN:

Traffic Impact: Westbound SR 710 approximately miles northwest of SW Fox Brown Road, in Indiantown, 9 a.m. to 4 p.m., Tuesday, Jan. 17 through Wednesday, Jan. 18 and Tuesday, Jan. 24 through Thursday, Jan. 26, 1 of 2 lanes closed, for installation of a new culvert, guardrail work, and driveway work. For more information you can contact Ivey Spivey with Phillips and Jordan at 865-601-6494

Traffic Impact: Eastbound and westbound SW Warfield Boulevard over St Lucie Canal, between SW Citrus Blvd and SW Indiantown Ave, in Indiantown, 9 a.m. to 4 p.m., Monday, Jan. 23 through Sunday, Feb. 6, 1 of 2 lanes closed, for utility work. For more information, please contact Edward Handy at 305-979-4696, or Jose Lopez at 786-259-7534.

STUART:

Traffic Impact: Eastbound and westbound NW Britt Road between NW Pine Lake Drive and NW Federal Highway, in Stuart, 9 a.m. to 3:30 p.m., Tuesday, Jan. 24 through Thursday, March 30, 1 of 2 lanes closed, for FP&L utility work. During this time, sidewalks may be closed, and pedestrian detours will be in place. For more information, please contact Martha Ann Kneiss at 772-463-2810.

TEQUESTA:

Traffic Impact: Northbound and southbound U.S. 1 between SE Jupiter Inlet Way and Coconut Road, in Tequesta, 9 a.m. to 4 p.m., Monday through Friday, through Friday, March 31, 1 of 2 lanes closed, for utility work. For more information, please contact Rafael Ureña at 772-882-5084.

Traffic Impact: I-95:

Traffic Impact: Northbound I-95 between 500-feet south to 200-feet north of bridge over Bridge Road, in Hobe Sound, around-the-clock, until repairs are completed, the outside shoulder closed, for bridge beam repair work. For more information, please contact Guillermo Canedo, Communications Manager, FDOT District Four at 954-777-4302.

BRIGHTLINE:

Traffic Impact: Jensen Beach – Riverview Drive. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit Riverview Drive. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Jensen Beach – Skyline Drive. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit Skyline Drive. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Jensen Beach – NE Jensen Beach Boulevard. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NE Jensen Beach Boulevard. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Jensen Beach – NE Dixie Highway. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NE Dixie Highway. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Stuart – Alice Street. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NW Alice Street. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Stuart – NW Fern Street. Daytime flagging operations, 7 a.m. to 5 p.m. for rail work. Crossings may be closed briefly (1-2 minutes) as trucks enter and exit NW Fern Street. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Stuart – West of SE Dixie Highway/A1A between SE Decker Avenue and SE Monterey Road. Daytime southbound shoulder closures for concrete pouring, Monday to Friday, 7 a.m. to 3 p.m. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: Stuart – Southbound A1A from south of SE Cove Road to south of SE Alicia Street. Continuous shoulder closure through Q1 2023. For more information, please contact Katie Mitzner at 407-502-3587.

Traffic Impact: High Speed Testing up to speeds of 110 mph. Daytime testing, 7 a.m. to 7 p.m., through Monday, Jan. 23.Flaggers and law enforcement will be present at the following railroad crossings where trains will operate at high speeds.

Traffic Impact: St. Lucie County

Traffic Impact: Walton Road

Traffic Impact: Riverview Drive

Martin County

Traffic Impact: County Line Road

Traffic Impact: Skyline Drive (CR 722)

Traffic Impact: Pitchford Landing

< class='textbodyright'>Traffic Impact: For more information, please contact Katie Mitzner at 407-502-3587.


Please click on a link below to view lane closures in other areas of the Treasure Coast:
I-95 Palm Beach CountyMartin County Northern Palm Beach CountySt. Lucie County Western Palm Beach CountyIndian River County
 
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone