SR 76/Kanner Highway Resurfacing and Improvements Project
Financial Number: 446112-1-52-01
Project Length: 1.913 miles
Project Limits: SR 76/Kanner Highway from North of SR 710/Warfield Boulevard to St. Lucie Mobile Village
Start Date: July 26, 2023
Completion Date: Spring 2024
Contractor: J.W. Cheatham, LLC
Estimated Construction Cost: $2,771,566.18
Scope of Work:
The project improvements consist of repaving and restriping the existing roadway and shoulders, widening
the existing shoulders from 10 feet to 12 feet, upgrading signing and pavement markings, installing audible
vibratory treatment along the centerline and edge lines of the roadway, extending the existing guardrail at
selected locations to address canal hazards, regrading the existing ditch in front of St. Lucie Mobile Village,
and replacing the existing Traffic Monitoring Site (TMS) loops.
Contact Information:
"Para información y preguntas en Español, por favor llame al (954) 777-4302."