Treasure Coast Header Image

SR-9/I-95 Resurfacing and Safety Improvements Project

Financial Number: 443847-1-52-01

Project Limits: 3.2 miles

Project Length: From south of Gatlin Boulevard to St. Lucie West Boulevard

Start Date: June 16, 2023

Completion Date: Summer 2024

Contractor: OHLA-USA, Inc.

Estimated Construction Cost: $9.9 million

Scope of Work:

The project improvements consist of extending the SR-9/I-95 northbound on-ramp auxiliary lane from Gatlin Boulevard and the SR-9/I-95 southbound on-ramp auxiliary lane from St. Lucie West Boulevard, installing a Dynamic Message Sign along SR-9/I-95 northbound south of the Gatlin Boulevard interchange to provide real time messages to motorists, installing LED roadway lighting on SR-9/I-95 between Gatlin Boulevard and Crosstown Parkway, upgrading interchange signage, resurfacing SR-9/I-95 and correcting cross-slopes, and installing a Dynamic Curve Warning System north of the Gatlin Boulevard interchange to provide a warning to motorists of excessive speed and wet pavement conditions.

Point of Contact:

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

Documents:

PDF IconI-95 Safety Improvements Project Meeting Open House Invitation Flyer

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details
Construction of Bridge Light Pole Pilasters, Mar. 2024Containment system and demolition of concrete, Mar. 2024
Installation of new overhead sin panel at the southbound exit at Crosstown Parkway, Mar. 2024 Removing forms from completed pilasters, Apr. 2024Placing FC 5, Apr. 2024





Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone