SR 5/US 1 Resurfacing Project from north of SR 70/Virginia Ave to Sunny Ln.

Financial Number: 446109-1-52-01

Project Limits: 3 miles

Project Length: SR 5/US 1 from north of SR 70/Virginia Avenue to Sunny Lane

Start Date: November 20, 2023

Completion Date: Fall 2024

Contractor: C.W. Roberts Contracting, Inc.

Estimated Construction Cost: $6.1 million

Scope of Work:

The project improvements consist of milling and resurfacing the existing travel lanes with the exception of the Taylor Creek Bridge, upgrading deficient sidewalks and curb ramps, installing new pavement markings, upgrading signage, and upgrading pedestrian signals and pushbutton detectors at signalized intersections.

Point of Contact:

Para información y preguntas en Español, por favor llame al (954) 777-4302.

Documents:

PDF IconVPM US 1 Resurfacing Project from Virginia Ave to Sunny Lane

PDF IconSR 5 from Virginia Ave to Sunny Lane Project information flyer

 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details
Northbound US 1 just south of Virginia Avenue, Nov. 2023 Looking southwest at SR 5 and Ohio Avenue, Nov. 2023 Northbound US 1, setting bond breaker for sidewalk pouring, Dec. 2023 Looking southeast at SR 5 and Tennesse Avenue, pouring sidewalk, Dec. 2023
Looking southeast at SR 5 and Avenue C hand finishing Type F curb and gutter for curb ramp replacement, Jan. 2024 Looking north at SR 5 at Parkway. Temporary asphalt curb ramp and newly installed pedestrian signals on pedestal, Feb. 2024 SE Corner SR 5 and Avenue D, newly installed directional bore conduit for traffic signal and lighting improvements, Feb. 2024 Installation of Ped pole foundation at Avenue A, Mar. 2024
Trenching operation for Ped Pole conduits at Avenue A, facing north, Mar. 2024 Looking North at Avenue C. Subcontractor Carr Construction preparing site to perform directional bore operation at the SW corner of Avenue C, April 2024 Looking North at Avenue C, Subtractor finishing with the installation of the ped pole foundation at the NW corner of Avenue C, April 2024 Pedestrian detour in place at US 1, May 2024
Subcontractor continues Ped Pole Bases installation, May 2024 Contractor setting MOT, looking south from southbound US 1 and Tennessee Avenue, June 2024 Subcontractor preparing area for the liner installation operation, northbound US 1, June 2024 Looking Southeast from Orange Avenue. Subcontractor pouring spread footer on southbound US 1, July 2024
Looking Southwest from NB of US 1 by Tennessee Avenue, subcontractor performing pipe lining operation on northbound US 1, July 2024Looking South from SB of US 1 by Citrus Ave intersection. Subcontractor performing milling at NB of US 1, Aug. 2024Placing Temp Asphalt at Ave C repair area, Aug. 2024Contractor paving northbound US 1 between Ohio Ave. and Parkway Ave intersection, looking north from northbound US 1, September. 2024
Looking North from NB of US 1 at Tennessee Ave intersection, paving a side street at Tennessee Ave. Intersection, September. 2024US 1 northbound contractor paving US 1 by Avenue H intersection, Oct. 2024Contractor paving facing south from US 1 and Avenue B intersection, Oct. 2024Subcontrator installing loops for TMS, southbouns US 1 towards Cedar Place, Nov. 2024





Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
zero