SR 5/US 1 Resurfacing Project from Harrison Street to South of Davis Street

Financial Number: 432325-1-52-01

Project Length: 1.472 miles

Project Limits: State Road (SR) 5/US 1 from Harrison Street to South of Davis Street

Virtual Public Meeting:

Start Date: August 17, 2023

Completion Date: Spring 2024

Contractor: Ranger Construction Industries, Inc.

Estimated Construction Cost: $3.9 million

Scope of Work:

The project improvements consist of milling and resurfacing the existing roadway, replacing sidewalk and providing sidewalk connectivity and continuity, removing abandoned driveways, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, upgrading pedestrian signalization and lighting at signalized intersections, and upgrading drainage, signage and pavement markings.

"Para información y preguntas en Español, por favor llame al (954) 777-4302."

Click here for upcoming lane closures

Documents:

PDF IconSR 5, Harrison to Davis St Resurfacing Project Meeting Invitation Flyer

 

Project Photos

Pre-Construction

Click to view enlarged version/details
During construction During construction During construction During construction
During construction During construction During construction

During Construction

Click to view enlarged version/details
During construction Sidewalk poured southbound, Dec. 2023 Southbound MOT signs installed Aug. 2023 Northbound MOT signs installed, Aug. 2023
Southbound trees relocated, Sept. 2023 Northbound Gravity wall installed, Sept. 2023 northbound sidewalk poured, Oct. 2023 Northbound gravity wall installed, Oct. 2023
Detectable warning pads, Nov. 2023 southbound handrail placed, Jan. 2024 northbound sidewalk and detectable warning pad placed, Jan. 2023 Southbound reconstruction work at Main Street intersection, Feb. 2024
Mainstreet intersection  vehicle signal backplate installed, Feb. 2023 Southbound patterned pavement, Mar. 2024 Surface applied detectable warning pad, facing northbound, Mar. 2024 Sign installation, northbound, Apr. 2024
Pre formed thermoplastic, Apr. 2024

 

 

 

Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County

Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone