SR 5/US 1 Resurfacing Project from Harrison Street to South of Davis Street
Financial Number: 432325-1-52-01
Project Length: 1.472 miles
Project Limits: State Road (SR) 5/US 1 from Harrison Street to South of Davis Street
Virtual Public Meeting:
Start Date: August 17, 2023
Completion Date: Spring 2024
Contractor: Ranger Construction Industries, Inc.
Estimated Construction Cost: $3.9 million
Scope of Work:
The project improvements consist of milling and resurfacing the existing roadway, replacing sidewalk and providing sidewalk connectivity and continuity, removing abandoned driveways, upgrading pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards, upgrading pedestrian signalization and lighting at signalized intersections, and upgrading drainage, signage and pavement markings.