SR 9/I-95 from Gatlin Boulevard to St. Lucie West Boulevard Safety Improvements Project
Financial Number: 443847-1-52-01
Project Length: 3.2 miles
Project Limits:
SR 9/I-95 from Gatlin Boulevard to St. Lucie West Boulevard
Public Workshop: The public meeting will be offered in two formats: virtual (online) and in-person. Both formats will take place at the same time
Date: April 21, 2022, at 5:00 p.m. to 7:00 p.m.
In-Person Location: St. Lucie County Public Library, Paula A. Lewis Branch located at 2950 SW Rosser Boulevard, Port St. Lucie, FL 34953
The latest social distancing guidelines will be followed.
Projected Letting: December 2022
The proposed project is being developed in accordance with the Civil Rights Act of 1964. Under Title VI of the Civil Rights Act, public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. To express concern(s) relative to the Department’s compliance with Title VI, please contact the following:
Contact Information:
Sharon SinghHagyan District 4 Title VI Coordinator
Install a Dynamic Message Sign (DMS) south of Gatlin Blvd interchange to provide real time messages to drivers
Install roadway lighting between Gatlin Boulevard and Crosstown Parkway on I-95
Install new freeway guide signs
I-95 pavement resurfacing and cross-slopes correction
Install dynamic curve warning system north of Gatlin Boulevard interchange; system will provide warning to drivers of excessive speed and wet pavement conditions.
Construction Impacts:
Temporary lane closures during off peak hours will be performed
Village Parkway Dr. will be used as a detour route during night-time lane closures on Gatlin Blvd northbound on ramp to I-95
Eastbound St. Lucie Boulevard will be used as a detour route during night-time lane closures on westbound St. Lucie Boulevard southbound on ramp to I-95.